{"id":624,"date":"2016-06-13T14:29:46","date_gmt":"2016-06-13T08:59:46","guid":{"rendered":"https:\/\/www.cadc.gov.in\/?p=624"},"modified":"2016-10-12T14:33:59","modified_gmt":"2016-10-12T09:03:59","slug":"approach-road-to-new-kamalanagar-college-building-blacktopped","status":"publish","type":"post","link":"https:\/\/www.cadc.gov.in\/cc\/2016\/06\/13\/approach-road-to-new-kamalanagar-college-building-blacktopped\/","title":{"rendered":"Approach Road to New Kamalanagar College Building Blacktopped"},"content":{"rendered":"<p><strong>Kamalanagar, 13 June 2016:<\/strong> Blacktopping of the approach road to new Kamalanagar College building, located at Aratinagar, has been completed with fund provision under additional plan fund 2015-16. A amount\u00a0of Rs.80.00 Lakh had\u00a0been sanctioned for the work.\u00a0The CEM, CADC Dangu Kali Kumar Tongchangya inaugurated the road on 13 June 2016.<\/p>\n<p>The new Kamalanagar college building has been completed a few years back with fund provision under NLCPR. It was constructed at an estimated cost of 224.00 Lakh. The approach road being katcha was one the reasons why the new building could not be occupied. The new building is also without electrification and water connection. These basic requirements have to be provided before the College can be shifted.<\/p>\n<p>The CEM, CADC while speaking on the occasion said that the DPR for the Block-B has been prepared. He said, \u2018This time we will ensure the class rooms size are big enough\u2019. He made this remark in view of the small size of the class room in the newly built structure.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kamalanagar, 13 June 2016: Blacktopping of the approach road to new Kamalanagar College building, located at Aratinagar, has been completed with fund provision under additional plan fund 2015-16. A amount\u00a0of Rs.80.00 Lakh had\u00a0been sanctioned for the work.\u00a0The CEM, CADC Dangu Kali Kumar Tongchangya inaugurated the road on 13 June 2016. The new Kamalanagar college building [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[12,32,42],"tags":[],"class_list":["post-624","post","type-post","status-publish","format-standard","hentry","category-press-releases","category-public-works-deptt","category-road-transport"],"translation":{"provider":"WPGlobus","version":"3.0.2","language":"cc","enabled_languages":["en","cc"],"languages":{"en":{"title":true,"content":true,"excerpt":false},"cc":{"title":false,"content":false,"excerpt":false}}},"acf":[],"_links":{"self":[{"href":"https:\/\/www.cadc.gov.in\/cc\/wp-json\/wp\/v2\/posts\/624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cadc.gov.in\/cc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cadc.gov.in\/cc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cadc.gov.in\/cc\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cadc.gov.in\/cc\/wp-json\/wp\/v2\/comments?post=624"}],"version-history":[{"count":3,"href":"https:\/\/www.cadc.gov.in\/cc\/wp-json\/wp\/v2\/posts\/624\/revisions"}],"predecessor-version":[{"id":627,"href":"https:\/\/www.cadc.gov.in\/cc\/wp-json\/wp\/v2\/posts\/624\/revisions\/627"}],"wp:attachment":[{"href":"https:\/\/www.cadc.gov.in\/cc\/wp-json\/wp\/v2\/media?parent=624"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cadc.gov.in\/cc\/wp-json\/wp\/v2\/categories?post=624"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cadc.gov.in\/cc\/wp-json\/wp\/v2\/tags?post=624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}